Saturday, March 5, 2011
Bathroom Progress
We're at the halfway point after having been side tracked by all of the repair work that needed to happen downstairs. All of the rough plumbing is in, the tub is in and has the surround and the radiators have been swapped out. All of the sudden it looks like a real bathroom!
Next week will be devoted to tiling and we'll really see if we made some good choices about tile and fixtures. Something about the order of all of this seems wrong. I'm sure there is a way to put together a computer model to help us visualize how the tile will look on the wall but right now we're just finding comfort with the fact that we usually pick good looking things.
One of the more exciting and tiny projects are the radiators. The one in the bedroom was comically large so we swapped it with the appropriately sized bathroom one. All this means is that we can get the wall back and actually put stuff there.
I'll be away next week and hope I'll come home to a mostly done bathroom!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment